Flagship Product
Every FDRE bid comes down to one number — the tariff. RTC-X works backwards from your target equity IRR, stress-tests it across thousands of dispatch solves and a Monte Carlo resource-risk simulation, and delivers the bankable bid tariff you commit to.
The stakes are not abstract. A 250 MW round-the-clock supply settles roughly 1.8 TWh a year, so every 10 paise on the tariff is worth about ₹18 crore a year — for the life of the PPA, with no second chance after submission. Bid too high and the tender is lost; bid too low and equity returns erode for 25 years. A single-scenario spreadsheet assumes one future, keeps Year 1 battery performance for 25 years, and locks in an RE-to-BESS ratio that cannot be undone once the bid is won. Each of these risks is quantifiable before submission — that is what RTC-X is for.
The model behind RTC-X has sized more than 10 utility-scale FDRE and RTC bids.* *team experience
From tender document to bid number
A configured tender runs in hours. A first bid — data collection, sizing and simulation, a sensitivity review with a go or no-go recommendation, and the final bid package — typically takes 2 to 4 weeks end to end.
Software Plans
Monthly rates, billed quarterly. Annual billing: two months free.
A project is one tender workspace, active in a calendar month. Every plan includes the full engine — block-level dispatch, the sizing optimizer, 25-year project finance and exports.
Discounted rates apply to subscriptions started before October 2026; standard rates apply thereafter. Custom run limits and dedicated single-tenant deployments on request — write to info@elarispower.com.
FAQ
RE generation profiles for the candidate sites, BESS specifications including the OEM warranty envelope, the tender's PPA and penalty terms, and grid connectivity constraints. A shortlist of BESS vendors helps but is not required to start.
A configured tender runs in hours on the platform. A first engagement, including data collection, sizing and simulation, sensitivity review, and the final bid package, typically takes 2 to 4 weeks end to end, with a go or no-go recommendation in week 3.
The bid tariff with P50 and P90 revenue projections, the optimal RE-to-BESS ratio and storage duration, an augmentation schedule, 25-year project financials including P&L, DSCR and balance sheet, and the exportable investment report and diligence workbook.
The dispatch engine agrees to better than 99.7% with an independently built reference model, and every release is gated by an automated test suite. Validation detail is available for lender and IE review on request.
Sizing is technology-agnostic: lithium-ion in its current formats, flow batteries, pumped hydro, and emerging chemistries, each with its own cost trajectory and degradation behaviour.
Data is hosted and backed up in India, isolated per organization at the data layer, encrypted at rest with drill-tested restore procedures, and audit-logged. A security document for procurement review is available on request.
Trust & Security
Security & data-practices document for procurement review — request it here.
Get in Touch
Whether you're optimizing dispatch, sizing a bid, or evaluating vendors — we'd like to hear from you.